The Benefits of Simple Lakeshore Practices

The Anoka Conservation District (ACD) recently installed a 70-foot lakeshore restoration project to mitigate active erosion at a property on the east side of Martin Lake in northern Anoka County. This section of property is heavily used by the family and was a priority to keep intact. The shoreline had receded/eroded back, with certain areas experiencing severe undercutting caused by wave action. These vulnerable sections could lead to additional property loss in the future and contribute to pollutant loading into Martin Lake, further degrading water quality. 

As designed, this project should stabilize the shoreline and allow new vegetation to become established from existing native sources. It is estimated that the project will prevent 1.3 pounds/year of phosphorous from entering the waterbody throughout the life of the project.

Coir logs are designed entirely of natural materials that are made to biodegrade into the soil overtime. The material is inexpensive, durable, and able to be shaped uniquely to the shoreline. Coir logs can be purchased in different densities, lengths, and diameters, depending on the erosion situation. Compared to other types of erosion control practices, coir logs are low in cost and can be installed by landowners without professional guidance. These practices are also easy to maintain because landowners can fix individual sections that may be damaged over time.

Coir logs protect against wave action and allow banks to stabilize while encouraging vegetation growth. Sections of coir logs are installed in a continuous line near the bank and secured into place using wooding stakes which will also naturally degrade. Aquatics plants are commonly planted into the coir log to provide more enhancement.

This project was funded by the landowner and the ACD cost-share program. ACD provided project administration, design services, and project installation. 

  780 Hits

New Cedar Tree Revetments on the Rum River

Cedar tree revetments are a cost-effective bioengineering practice that can be used to stabilize actively eroding riverbanks. ACD staff in partnership with the Conservation Corps of Minnesota (CCM) installed a cedar tree revetment in Rum South Regional Park in the City of Anoka in July 2022. 

Erosion at the site was dominated by bank undercutting-- the beginning stage of a more serious issue. Excessive erosion along riverbanks threatens property, contributes sediment and nutrients to the receiving water body, and eliminates wildlife habitat. 

Installation of the 550-foot revetment and live bare-root plants will slow or stop the erosion and reduce the likelihood of a much larger and more expensive project being needed in the future. Cedar brush was also installed to provide additional soft armoring. Not only do revetments help protect against erosion, they also provide excellent habitat.

Pollution reduction from this project is estimated to prevent 24.75 tons of sediment and 21.03 pounds of phosphorus from entering the Rum River annually!

Funding for this project was provided by the Conservation Partners Legacy and a CCM crew labor grant funded by the Clean Water, Land, and Legacy Amendment. ACD provided project management and construction oversight throughout the process.  

  966 Hits

Lessard-Sams Outdoor Heritage Council Recommends Funds for Rum River Stabilization Projects

The Lessard-Sams Outdoor Heritage Council is recommending $952,000 from the Outdoor Heritage Fund for ACD to stabilize eroding Rum Riverbanks utilizing habitat-building, bioengineering approaches over the next three years. Bioengineering techniques stabilize and armor eroding riverbanks in a way that both protects the bank from further erosion and provides traversable habitat for wildlife. These techniques rely on using natural materials such as tree trunks and root wads, in-stream rock weirs, native plantings and tree staking, gradual slope grading, and minimal hard armoring where necessary. Current erosion along streambanks, as well as traditional armoring techniques like riprap, result in a wall or barrier to wildlife. The bioengineering techniques that will be employed by ACD in the Rum River will eliminate those barriers and provide additional habitat for all kinds of wildlife.

ACD has identified over twenty eroding banks along the Rum River in Anoka County that it will be seeking to address with these funds. It is anticipated that four to eight sites will be stabilized with the $952,000 from the LSOHC and an additional $236,000 in local funds from Anoka County and the Upper and Lower Rum River Watershed Management Organizations. Anoka County has pledged $442,000 in Rum River stabilization matching funds over the next five years. The remaining funds will be used as match for future grant applications.

The Lessard-Sams Outdoor Heritage Council has made the funding recommendation to the Minnesota Legislature, who will draft final bill language during the 2020 legislative session. ACD will begin reaching out to landowners with identified eroding banks suitable for these stabilization techniques after the funding is finalized.

  Example photo of an eroding Rum Riverbank stabilized with bioengineering techniques. This project was the result of the continuing partnership between ACD and Anoka County Parks.